What actually sets MOQ and unit price on a silicone part.

Neither number is a policy. Both fall out of the part, the mould and the packing.

MOQ is a mould decision before it is a commercial one

A compression mould carries a fixed number of cavities. One cycle produces that many parts, and a run has to be long enough to amortise setup, material batching and inspection. That is why MOQ moves with the part rather than with the customer:

Because of this, we publish MOQ per listing rather than per category, and confirm it in the quotation once the part and packing are known. A supplier quoting one flat MOQ across an entire catalogue is usually quoting the listing, not the part.

What moves the unit price

VariableWhy it changes the price
Part weightMaterial is billed by weight; heavier parts cost more before any labour
Material gradeA platinum-cured compound for food or skin contact costs more than a general-purpose grade
Wall thickness and geometryThick sections and deep undercuts lengthen the cycle; cycle time is machine time
ToleranceA tight tolerance may mean a slower cycle, extra trimming or a gauging step
Number of coloursEach colour is a separate run with cleaning in between
Secondary operationsPrinting, assembly, individual packing
Order quantityFixed costs spread over more pieces, which is why quotes are tiered

Why quotes are tiered

Tooling and setup are paid once; material and machine time are paid per piece. A tiered quote simply spreads the fixed part across different quantities. This is also why comparing two suppliers at different quantities tells you nothing — ask both for the same quantity, the same packing and the same delivery term.

What to send for a comparable quote

  1. A drawing or a 3D file, and a reference sample if you have one
  2. Material expectation: general purpose, food contact or skin contact
  3. Hardness, if the part is handled or seals against something
  4. Colour, and whether it must match a Pantone reference
  5. Packing: bulk carton, polybag, or retail-ready
  6. Target quantity, and whether that is a trial order or a forecast
  7. Delivery term: FOB, CIF, EXW or DDP, and the destination port
A price given before the part weight and packing are fixed is an indication, not a quotation. Expect it to move once the drawing is reviewed — and treat a supplier who will not revise it after review as a risk rather than a bargain.

Tooling is a separate line

Ask for the mould cost on its own line, and ask who owns it. Paying for a mould should give you the mould, its maintenance history and a clear statement about where it is stored and whether it can be transferred. A lump-sum quote that hides tooling inside the unit price makes both the price and the exit unclear.