Company structure
The manufacturing operation started in 2013 in Huangjiang, Dongguan, and has run continuously since. In 2023 the group incorporated Shenzhen Tegneng Technology Co., Ltd. as its international business and export platform. Tooling, moulding, finishing, inspection and packing all happen inside the same plant, so a buyer program does not move between subcontractors.
What the plant does
Compression moulding runs on 20 presses; two injection moulding machines cover parts that need tighter tolerances or multi-material construction. More than 30 auxiliary units support mixing, trimming, printing, assembly and packing. In-house mould making keeps tooling lead times at 5–10 days for sample moulds and 7–12 days for production moulds.
Who works on your order
- 3 in-house designers for drawing review and DFM feedback
- 5 QC inspectors running IQC, IPQC and OQC checks
- 10 international sales staff handling briefs, quotations and follow-up
- About 60 people in total across the group
Products and markets
The plant produces baby and feeding items, kitchen and household products, sensory and educational toys, gifts and outdoor products. About 86% of turnover is exported to more than 40 countries, led by the United States (40%), Europe (40%) and Japan (10%).