Plant at a glance
2013Factory in production
8,000 m²Self-owned plant, Dongguan
52+Machines on site
100,000+Pieces per day
≈60People across the group
40+Export markets
Equipment and capacity
| Area | What is installed | Output / lead time |
|---|---|---|
| Tooling | In-house mould shop with CNC machining | Sample mould 5–10 days; production mould 7–12 days |
| Compression moulding | 20 presses with line-side trimming | Combined plant output over 100,000 pieces per day |
| Injection moulding | 2 injection machines | Used for tighter-tolerance and multi-material parts |
| Quality | QC laboratory and inspection bench | IQC, IPQC and OQC at three stages |
| Samples | Sample library for range reviews | Design sign-off 2 days; first samples 3 days |
Eight gates from brief to shipment
- Requirement review — application, market, compliance route and target quantity
- Drawing and DFM — wall thickness, draft, tolerances and material grade
- Quotation — tooling cost, unit price by quantity and delivery terms
- Tooling — mould design, machining and trial shots
- Sampling — dimensional and appearance check against the approved drawing
- Approval — signed sample and packing specification
- Mass production — moulding, trimming, assembly and print
- Final inspection and packing — OQC record, carton and labeling check
The plant, photographed